Leak Check and Evacuation) Multiple Evacuation Procedure

 

1. When to Use Triple Evacuation

  • Water-Cooled Condenser Rupture:

    • A significant amount of water might be present in the system.
  • System Running at a Vacuum:

    • If the system has been leaking and pulling water vapor into the low side.
  • System Open to Atmosphere:

    • If the system was open for an extended period, allowing moisture to enter.

2. Triple Evacuation Procedure

  • Step 1: Initial Vacuum to 1500 Microns

    • Vacuum: Pull a vacuum to 1500 microns.
    • Break Vacuum: Add dry nitrogen to 2 PSIG.
      • This helps to mix the dry nitrogen with any remaining moisture.
  • Optional Step: Run Compressor

    • Purpose: Dislodge water from the oil.
    • Method: Run the compressor for a few seconds to mix the oil and water.
  • Step 2: Second Vacuum to 1500 Microns

    • Vacuum: Pull a second vacuum to 1500 microns.
    • Break Vacuum: Again, add dry nitrogen to 2 PSIG.
  • Step 3: Final Deep Vacuum

    • Vacuum: Pull a final vacuum down to 500 microns.
    • Check Vacuum: Ensure the system holds the vacuum. If not, continue to pump and wait.

3. Detailed Steps with Diagrams

  • Initial Setup:

    • Connect the vacuum pump to the system.
    • Use a manifold with appropriate connections for nitrogen and vacuum pump.
  • Evacuation to 1500 Microns:

    • Start the vacuum pump and open the manifold valves.
    • Pull the vacuum down to 1500 microns.
    • Shut off the vacuum pump.
  • Add Nitrogen:

    • Set nitrogen regulator to a low pressure (around 10 PSIG).
    • Use a Y-fitting or four-port manifold to control nitrogen and vacuum flow.
    • Open the valve to add nitrogen into the system, breaking the vacuum.
  • Running Compressor (Optional):

    • Ensure some pressure in the system from nitrogen.
    • Run the compressor for about 5 seconds to stir up water in the oil.
  • Second Vacuum to 1500 Microns:

    • Open the valve to the vacuum pump and pull another vacuum down to 1500 microns.
    • Shut off the vacuum pump and add nitrogen again.
  • Final Deep Vacuum:

    • Open the valve to the vacuum pump and pull a deep vacuum to 500 microns.
    • Ensure the system holds the vacuum to confirm all moisture and non-condensables are removed.

4. Final Steps and Verification

  • Hold Vacuum:

    • Verify the system holds a vacuum below 500 microns.
    • If the vacuum holds steady, the system is moisture-free and ready for charging.
  • Charging:

    • Proceed with charging the system once the vacuum holds.